Installation of small gas-fired power plants with a total capacity of up to 60 MW at 16 mining facilities (Supporting critical distributed generation)

Purpose

The project involves the construction of a complex of gas-fired power plants with a total capacity of up to 60 MW at 16 production facilities of JSC "Ukrnafta". The plants will operate on the fields' own gas and will ensure the production of about 150 GWh of electricity per year. The goal of the project is to increase the stability of the Unified Energy System of Ukraine and uninterrupted power supply to oil and gas fields in the event of missile and drone attacks.

More information
Estimated budget
USD 64.0 million
Implemented by
JOINT STOCK COMPANY "UKRNAFTA"

Other projects