New construction of the solar power plant of the State Enterprise MA "Boryspil" on the territory of the International Airport "Boryspil" within the Boryspil district of Kyivska region
Purpose
Solar power plant with a nominal capacity of 5 MW. This capacity will be enough to provide up to 20% of the maximum consumption of electricity in the Boryspil DPA. (3,765,000 kWh – June 2019) Electricity generation from the station for a year of operation will be about 6,250 MWh Estimated start date is 2025. If financial resources are available, the Project can be implemented within 4 years.