Purchase of gas pumping units for JSC "Ukrtransgaz" (3 gas pumping units with a capacity of 13 MW)

Purpose

The purchase of 3 new 13 MW gas turbines (total capacity 39 MW) will ensure uninterrupted operation of the compressor shops of underground gas storage facilities and guaranteed gas withdrawal from the UGS at maximum productive levels, especially during critical periods. The use of powerful modern engines will allow achieving peak efficiency at the end of the injection and withdrawal seasons (during the most important and difficult periods). 

More information
Estimated budget
USD 47.5 million
Status
Preliminary Investment Feasibility Study
Implemented by
JOINT STOCK COMPANY "UKRTRANSGAZ"

Other projects