Installation of a gas-fired power plant up to 20 MW in Ivano-Frankivsk region: Project FIII
Purpose
The capacity expansion project for the Support of Critically Necessary Distributed Generation Stage V in Ivano-Frankivsk region, it is expected to install an additional gas piston unit manufactured by Wärtsilä with a capacity of up to 20 MW at the own production site of JSC "Ukrnafta".